It's 5.45am at a distribution centre. A trailer clipped door 14 on the way out last night and it's hanging off one track. Door 9 opens fine, but the leveller lip won't extend. Two bays are down out of twelve.
At the gatehouse, the queue has started. The first wave of trailers are all booked on time slots, and the transport office is already moving loads round the bays that still work.
Nobody would call a dock door a critical machine. Yet the bays are where the whole site meets the road. Lose two of them at the start of a shift and you can be chasing the plan for the rest of the day.
Don't bridge it to get it going
The fastest way to get a powered door moving is to defeat whatever's stopping it. Bridge out the safety edge. Tape over the photo eye. Wedge the limit switch. We've all seen it done. It's also how a door comes down on a driver walking under it.
The Workplace Regulations set out what doors and gates must have. An upward opening door needs "a device to prevent it falling back". A powered door needs "suitable and effective features to prevent it causing injury by trapping any person". Where it matters for safety, a powered door must be able to open by hand if the power fails, unless it opens on its own (regulation 18).
HSE's guidance on the regulations gives examples of those features. A sensitive edge or other detector that stops or reverses the door when it's obstructed. A device that limits closing force. A hold-to-run control, which HSE says is only suitable where the risk of injury is low and the door closes slowly (L24, paragraph 180)*.
So if the safety edge is damaged, the fix is a new safety edge, not a link wire. If the door has to run before the part arrives, lock it open or shut and take the bay out of the plan. Our guide to rapid roll door faults has the fault-finding order for edges, photo eyes and limits.
Sectional doors and springs
A door off its track after an impact needs more care than it looks. On a sectional door the torsion springs hold a lot of stored energy. A damaged door can be partly supported by springs, partly by a bent track and partly by luck.
Here's our view. If the panels are twisted, a track is bent or a spring has broken, prop the door safe, cordon it off and get a door engineer. Let the shift fitter do the electrics, the photo eyes and the limit settings. Leave the springs and cables to someone who does them every week.
Powered doors are on HSE's list of equipment that needs a system of maintenance (L24, paragraph 46)*, under the duty to keep workplace equipment in efficient working order and good repair (regulation 5). A door that's been "fixed" with a bent track and a cable tie isn't in good repair.
The leveller is a lifting table you drive on
Dock levellers look simple. Under the plate there's a hydraulic power pack, a lift cylinder, a lip cylinder and a lot of stored energy.
HSE's warehousing guide lists the main hazards. Feet or toes trapped as the platform comes down. Trucks overturning. People and goods falling. And people trapped underneath the leveller (HSE, HSG76).
That last one is the maintenance risk. HSG76 expects levellers to have manually operated scotches, or something equally effective, so the platform can be locked in the raised position for maintenance or repair. Nobody goes under a leveller held up only by hydraulics. Raise it, fit the maintenance strut, isolate the power pack, and then start work.
On a leveller that won't lift or a lip that won't extend, the usual suspects are the obvious ones first. The power pack running? Oil level? A tripped overload or a failed contactor? Then the hoses, the cylinders and the valves. Our post on dock leveller faults goes through it in order.
HSG76 also says a leveller should have a mechanism that stops the platform falling in an emergency, such as a driveaway. That's the safety feature that matters most when it fails, so test it after any repair to the hydraulics.
Keep the trailer where it is
The dock incident every transport manager dreads is a trailer moving while a truck is still inside it. HSE's transport guide calls out drivers pulling away from the bay unexpectedly, and gaps opening up as lift trucks run between the bay and the trailer (HSE, HSG136). It lists ways to stop it, including vehicle or trailer restraints, wheel chocks, traffic lights, and controlling access to the keys or cab.
When a bay is down and the transport office is moving loads around, those controls get stretched. Drivers are sent to bays they don't know. Lights get ignored. If your bays have interlocks between the door, the leveller and the trailer restraint, a fault in one can tempt someone to override the lot. Fix the fault. Don't fix the interlock.
Small faults, real money
Here's the part most sites don't price up. A bay down at 6am means trailers waiting in the yard, drivers' hours ticking, slots re-planned and missed, and a team loading round the problem all morning. Our post on late trailers and missed slots shows how quickly that adds up.
The faults are often small: a photo eye knocked out of line, a safety edge cable chewed by a door, a burst hose on a power pack. The cost comes from waiting for the door company's next free engineer. So the answer is an engineer you can get on site fast who can do door controls and leveller hydraulics, and a few spares held on site.
What to do on Monday
- Walk every bay and check each leveller has its maintenance strut, and that people know how to use it.
- Put a small spares kit together: photo eyes, a safety edge, limit switches and a leveller hose for your most common model.
- Agree what your own engineers can fix on doors and levellers, and what always goes to the door company.
- Check every bay's trailer restraint or chock rule is still being followed on the busiest shift.
* L24 paragraph references correct as of 7 November 2026. Check HSE's L24 and HSG76 for the latest. Paragraph numbers refer to L24, second edition (2013). HSG76 references are to the second edition (2007).