TPM on a real shop floor

TPM boards go up with a launch day and fade within a year. What operator care looks like when it works, and where the line sits between operator and fitter.

SiteSOS team · · 5 min read

The TPM board went up three years ago. There was a launch day, a consultant, laminated check sheets and a box of red tags. There were bacon rolls.

Now the board's faded. The red tags are in a drawer in the team leader's office. The check sheets are still ticked every shift, by the same pen, in the same place, at the same time.

It's 6am on Monday. The operator on line 3 notices the infeed chain is slack. They don't touch it, because that's maintenance. They don't tag it, because the last three tags went nowhere. At twenty to ten the chain jumps the sprocket and the line stops for two hours.

TPM fails on most sites because it gets sold as a programme. On a real shop floor it comes down to three things. Operators who look after their own machine. A fast route for what they find. And fitters freed up for the work only they can do.

Forget the wall chart

You don't need a launch. You need one machine, one operator who cares about it and one fitter willing to spend time with them.

Start with the machine that annoys everyone. The one with the micro-stops nobody logs, the jams, the "it always does that". Stand at it with the operator and the fitter for an hour. Clean it together. Every leak, loose bolt, missing cover and worn belt you find gets a tag.

That first clean usually turns up more than people expect. It also gives the operator a picture of what "right" looks like, which no check sheet can.

Draw the line between operator and fitter

This is where TPM goes wrong on most sites. Either operators do nothing, or someone decides they can do "basic maintenance" without saying what that means.

HSE's code of practice for PUWER is clear on the principle: "Maintenance work should only be done by people who are competent to do the work" (L22, paragraph 79). That doesn't rule operators out. It means you decide task by task, and train for each one.

Here's where we'd draw the line to start with. Operators can:

  • clean the machine and look for leaks, wear and damage while they do
  • check oil levels in sight glasses and top up from a marked container
  • grease external points that are designed to be reached safely
  • check belt and chain tension by eye against a marked guide
  • tighten loose covers that don't need a guard off

Anything that needs a guard off, a lock on or a meter out stays with the fitter, unless the operator has been trained and signed off for that task. Write the split down for each machine. A skills matrix is a good place to hold it.

The training has to be real. Employers must provide health and safety training when new work equipment or a new system of work comes in, and it should be during working hours (Management Regulations 1999, regulation 13). A ten-minute talk at the start of a shift doesn't cover it.

A check sheet with no conversation is wallpaper

Operator checks are pre-use checks. HSE's code of practice says an inspection under PUWER doesn't include "a pre-use check that an operator makes" before using the kit. It also says pre-use checks don't need recording (L22, paragraph 81).

So the only job the tick sheet has is to make someone look. If the sheet is ticked and nobody looked, it's worse than no sheet, because it tells you the machine was fine when it wasn't.

We'd keep the checks short. Five minutes, six or seven points, each with a photo of what good looks like. Swap the points round every few months so they don't become a habit of ticking. And have a team leader stand with the operator once a week and do the check together.

Make every tag go somewhere

This is the bit that kills TPM. An operator hangs a tag. Nothing happens. They hang another. Nothing happens. They stop hanging tags.

HSE's advice on maintenance includes "having a reporting procedure for workers who may notice problems while working on machinery" (HSE, maintenance of work equipment). A tag is that procedure. It only works if it gets an answer.

So set one rule and keep it. Every tag gets a reply within a day. The reply can be "fixed", "booked for Thursday" or "we've looked and it's fine, here's why". What it can't be is silence. Put the open tags on the shift handover sheet so they're seen every day.

When an operator spots a fault early, say so in front of the team. That's what keeps the tags coming. If the catch turns out to be a breakdown that was really an operator problem, handle it the same way: fix the process, and keep the person on side.

Your fitters need the time to start it

Here's the catch nobody puts on the launch slides. TPM costs maintenance time before it gives any back.

Someone has to clean the machine with the operator, write the check cards, train each shift and answer the tags. If your fitters are flat out on breakdowns, none of that happens. The board goes up, the fitters never get to it, and the operators learn that TPM means more forms.

So be honest about the hours. Free one fitter for the first few weeks on the first machine. If that leaves a gap on the breakdown rota, fill it with cover for those weeks. A few weeks of cover is cheap next to another year of the same stoppages.

Once it's working, the payback comes in fitter time. Fewer small faults reach the workshop. More of your team's week goes on planned work and root causes. And the operator spots the slack chain at 6am, while it's still a five-minute job.

Measure the machine, not the board

Don't judge TPM by how many check sheets are ticked. Judge it by the machine. Count the stops and the minutes lost, before and after. If you run OEE, watch availability on that one line. If the numbers haven't moved after three months, go back to the machine and ask the operator what's getting in the way. They'll usually tell you.

What to do on Monday

  1. Pick one machine that stops too often. Clean it with the operator and a fitter, and tag everything you find.
  2. Write down, task by task, what the operator does and what stays with maintenance.
  3. Set the rule that every tag gets an answer within a day, and put open tags on the handover sheet.
  4. Free one fitter for the first few weeks, and book cover for the gap if you need it.

* Paragraph numbers refer to L22, fourth edition (2014, amended 2018), correct as of 26 November 2026. Check HSE's L22 page for the latest.

Free up your fitters to make it stick

Running a site?

SiteSOS sends vetted maintenance engineers to your site for breakdowns and shift cover. You see the hourly rates first, and you approve the timesheet from your phone when the job's done.

Get engineers on call

Are you an engineer?

Breakdowns and shift cover near you, paid by the job. Offers show where, what, how far and the least you'll earn, and turning one down never counts against you.

Join as an engineer