It's 1am. The flow wrapper on line 3 has stopped on a servo fault. Your night engineer is a good mechanical fitter. They've never been inside that drive cabinet. The one person who has is asleep, and isn't on call this week.
The shift manager rings you. You know who could fix it. You just didn't know, until tonight, that nobody on nights could.
Every maintenance manager carries a skills matrix in their head. The trouble is it only lives there. It doesn't get checked when the rota is written, and it isn't there when you're on holiday.
What goes on the grid
Keep it simple. Names down the side. Down the top, put the things that actually stop your lines. Not job titles. Real kit and real tasks.
For a typical food or packaging site, that might be:
- servo drives on the wrappers, and resetting the axes after a fault
- going online to the PLC and reading the logic
- VSDs on the conveyors: parameters, fault codes, swapping a unit
- pneumatics: valve banks, cylinders, reading the circuit
- gearboxes, bearings and chain drives
- the palletiser robot: homing, recovery, teach pendant
- isolation and lock-off on each line
- the chiller or compressor house, if you look after it
Pull the list from your breakdown log. Sort last year's stoppages by machine and fault type. The top 15 or 20 make your columns. If a machine has never stopped and nobody touches it, it doesn't need a column yet.
Four levels are enough
Don't overthink the scoring. Four levels work on most sites:
- Can't do it
- Can do it with someone competent alongside
- Can do it alone, on any shift
- Can do it alone and teach someone else
Be honest about level 2. It means alone at 2am, with the shift manager asking how long, and nobody to ring. Lots of people are level 1 on kit they think they're level 2 on.
There's a legal side to this. Under the Management Regulations, an employer giving out tasks must "take into account their capabilities as regards health and safety" (regulation 13). HSE's code of practice for PUWER says maintenance "should only be done by people who are competent to do the work" (L22, paragraph 79). For electrical work, the Electricity at Work Regulations allow someone without the knowledge or experience to do the job only if they're "under such degree of supervision as may be appropriate" (regulation 16).
That's your level 1. It's a real level, with a real condition attached. Someone competent has to be there.
How to fill it in
Don't do it on your own at a desk. Do it with each engineer, one at a time, with the grid in front of you.
Ask about the last time they did each task. When was it? What did they do? Did they need help? You'll get a much straighter answer than "are you OK on drives?"
Then check the answers against your breakdown log. If someone says they're level 2 on the palletiser but every palletiser fault on their shift ended with a call to the day electrician, you have your answer.
HSE describes competence as "the combination of training, skills, experience and knowledge" plus the ability to apply them to do a task safely (HSE, what is competence). A ticket on its own doesn't put someone at level 2. Doing the job does.
For anything that needs a certificate, add a column for the expiry date. Keep the paperwork behind it. If you ever have to show that someone was competent for a task, you'll want more than a tick. There's more on that in training records that prove competence.
Now read it by shift
Here's where the matrix earns its keep. Most people read it by person. Read it by shift instead.
Take each column. For each shift, find the best level on site. Days, nights, weekends. If any shift has nothing above 1 on a machine that stops every month, colour it red.
You'll usually find three things.
First, the gaps. A shift that's blind on controls. A weekend with nobody who can recover the robot.
Second, the single points. A column where one person is the only 2 or 3 on the whole site. That's a column that goes red the day they book a fortnight in Spain. We look at that problem on its own in single-skill risk.
Third, the wasted talent. Someone at level 3 on drives who has spent the last year on days doing PPM on the boilers.
Use it every week
A matrix that lives in a drawer is no use. Put it on the wall in the workshop, or at least on the shared drive with the rota.
Use it in three places.
When you write the rota, check every shift has a 2 or better on the machines most likely to stop. If it doesn't, you know before the shift starts, not at 1am.
When you set the training budget, spend it on the red cells, and on getting a second person to 2 on every single-point column. That's a better test for a course than "who asked for one". There's more on choosing courses in training budgets.
When you book cover, give the agency or contractor the column you're short on. "A multi-skilled engineer" is a loose brief. "Someone who can reset the axes on a servo-driven flow wrapper" gets you the right person.
Our view
We think every site with more than two engineers should have one. It takes an afternoon to build and an hour a month to keep up.
It also changes the conversation with your boss. "We're short of engineers" is easy to ignore. A grid showing nights have nobody above level 1 on the line that stopped 30 times last year is much harder to ignore. Put a cost per hour against that line and the case almost makes itself. What an hour of downtime really costs shows how to get that figure.
What to do on Monday
- Pull last year's breakdown log and list the 15 to 20 tasks that stop your lines most.
- Sit with each engineer for 20 minutes and score them 0 to 3 against that list.
- Read the grid by shift and colour every cell where nobody on that shift is above 1.
- Pick the two worst red cells and decide this week how you'll cover them.