It's Saturday night. Your senior fitter is on the shift with an improver, two years out of their apprenticeship. Keen, quick, good with a spanner. On the rota it says "supervised by" next to the improver's name.
At 11pm the case erector stops. At the same moment the compressor throws a high temperature alarm at the far end of the site. The senior goes to the compressor. The improver goes to the case erector.
Nobody decided that. It just happened, because there were two faults and two people.
That's how supervision fails on most sites. Nobody's careless. The word "supervised" gets written on a rota, and then the shift pulls the two people apart.
Supervised means somebody decided
The law doesn't say a less experienced engineer can't work. It says they can't do work that needs knowledge or experience they don't have, unless they're under the right amount of supervision for that job.
The Electricity at Work Regulations put it in one line. No one should do work where technical knowledge or experience is needed to prevent danger unless they have it, "or is under such degree of supervision as may be appropriate having regard to the nature of the work" (regulation 16).
HSE's guidance on those regulations, HSR25 (third edition, 2015), is useful here. Supervision "does not necessarily require continual attendance at the work site". But the degree of supervision, and how it's done, is for you to arrange so that danger is prevented (HSR25, paragraph 241). The same paragraph says you should tell the supervisor exactly what they're responsible for, and think about putting it in writing.
So the senior on the other side of the site can still be supervising. But only if somebody decided beforehand that this job, done by this person, needs that level and no more.
The Management Regulations come at it from the other side. When you hand out tasks, you have to take people's capabilities into account (regulation 13). And under PUWER, the person supervising the use of the kit needs training as well as the person using it (regulation 9).
Four levels, written down
Here's what we'd do. For every engineer who isn't fully signed off, sort the common jobs into four levels.
- Alone. They can do it and report back. Changing a sensor, a belt, a wear part they've done ten times.
- Alone, then checked. They do it, and the senior looks before the machine runs. A new drive belt and tension, a guard refitted, a pneumatic cylinder swapped.
- With someone there. The senior is at the machine, not on the radio. Fault-finding on a panel, a first go at a drive fault, anything where the isolation is unusual.
- Not yet. Live testing, permits they haven't held before, work on kit with stored energy they don't know.
Keep it to one page per person and keep it at the shift desk. The senior should know what's on it. So should the shift manager, because they're the one who'll say "can't the new one have a look?" at 11pm. The senior also needs to know they can say no. Leaving them to argue it out with production on the night isn't fair.
Base it on what they've done on your kit, not on paper. A level 3 electrical ticket tells you what they've studied. It doesn't tell you they've isolated your palletiser, which has three supplies and an air dump that's easy to miss. If you have a skills matrix, this is the same exercise with the gaps filled in.
Isolation is the line
If there's one job that should never drift down a level, it's isolation.
HSE's guidance says someone isolating kit needs enough knowledge or experience "to prevent danger during the isolation". It also says the person doing the work must know enough not to work on adjacent live circuits (HSR25, paragraph 237). That's the bit an improver gets wrong. They isolate the motor they're working on and forget the control supply in the same panel. Or the heater circuit fed from somewhere else.
So until they're signed off on a machine's isolation, the senior proves it with them. Every time. If the senior can't get there, the job waits or someone else does it. Our guide to safe isolation goes through the steps.
The guidance also lists what "technical knowledge or experience" should cover. It includes understanding of the system being worked on, and "the ability to recognise at all times whether it is safe for work to continue" (HSR25, paragraph 239). That last one is what experience buys. A newer engineer will keep going when a senior would stop and ring someone.
When the shift splits
Back to Saturday night. Two faults, two people.
The answer is in the levels. If the case erector fault is a level 1 or 2 job for the improver, fine. They start, the senior checks it before restart. If it's level 3, they make it safe and wait, or they swap. The senior takes the case erector. The improver keeps an eye on the compressor and calls back with readings.
Sometimes neither works. Both faults need the senior. That's the night you find out you need a third pair of hands, and you need them now. A line stood for two hours because the only signed-off engineer is busy elsewhere is a real cost. So is an improver pushed past what they know. One costs output. The other can cost a lot more.
If that happens more than once a month, look at the shift pattern before you blame luck. Work out how many engineers your site needs, and have outside shift cover ready for the nights the numbers don't add up.
Apprentices and under-18s
Under-18s bring extra duties. HSE's advice is that young people "are likely to need more supervision than adults" (HSE, training and supervision). An apprentice on nights with one senior fitter who's always busy is a risk you've chosen, even if nobody meant to. The extra duties for young workers are worth a separate read.
Moving someone up a level
The levels only work if people move through them. Otherwise your improver is still level 2 on everything three years later, and you still have one engineer who can fix the line.
Set a short list of jobs to move up each quarter. The senior watches them done twice, signs them off and dates it. Put the sign-off in the training records. If something goes wrong later, that record is what shows the job was given to someone you'd judged able to do it.
What to do on Monday
- Write the four-level list for every engineer who isn't fully signed off. Start with your five most common breakdowns.
- Put the isolation sign-off for each machine on the same sheet, and make "senior proves it" the rule until it's signed.
- Tell your shift managers in writing that the senior fitter decides who does what on a breakdown.
- Count the nights last month when two faults needed the one senior. If it's more than one, plan cover for it.