Working time rules and maintenance overtime

Maintenance overtime runs on goodwill until someone adds up the hours. The 48-hour average, the opt-out, rest rules, night limits and what a breakdown changes.

SiteSOS team · · 5 min read

It's the end of a long month. Two of your four fitters have been off, one sick and one on holiday. The other two have covered it. Doubles, weekends, a call-in on the Tuesday night when the chiller tripped.

Then HR sends the hours report. One of them averaged 61 hours a week for the last six weeks. Nobody has an opt-out on file. And the night shift engineer has done seven 12-hour nights in nine days.

Nobody broke any rules on purpose. The overtime happened one shift at a time, and each shift made sense. But nobody added it up until the end.

Maintenance overtime is where the Working Time Regulations bite hardest. Here's what they ask, in the order you'll hit them.

The 48-hour average

A worker's working time, "including overtime", shouldn't average more than 48 hours* for each seven days (regulation 4). The average is normally taken over 17 weeks*. So one 70-hour week is fine if the rest of the period brings the average down.

The regulation also puts a duty on you. You have to take "all reasonable steps" to keep each worker inside the limit. "They volunteered" doesn't count as a step.

What counts as working time catches people out. GOV.UK lists paid overtime, unpaid overtime you've asked for, job-related training, and "time spent on call at the workplace". Time on call away from the workplace doesn't count (GOV.UK, calculating your working hours). So the fitter who sleeps in the rest room on standby is working. The one at home with a phone isn't, until the phone rings and they come in.

The opt-out

A worker can agree in writing to work more than the 48-hour average (regulation 4). It's their choice. GOV.UK says nobody can be sacked or treated unfairly for refusing to sign one (GOV.UK, opting out).

They can also end it. They must give at least seven days' notice* in writing, unless the agreement sets a longer period. That longer period can't be more than three months* (regulation 5). If you've opted people out, you must keep up-to-date records of who they are.

Here's our view. An opt-out on file is fine. An opt-out used so one fitter covers every gap gives you the tired engineer in our piece on fatigue and long shifts. HSE is clear that keeping to the hours rules alone doesn't manage fatigue.

Rest between shifts

Three rules sit alongside the 48 hours:

  • at least 11 consecutive hours'* rest in each 24 hours you work (regulation 10)
  • an uninterrupted 24 hours* off in each seven days, or 48 hours* in each fortnight if you decide (regulation 11)
  • a 20-minute* break when the working day is more than six hours* (regulation 12)

These are the ones a breakdown breaks. Your fitter finishes days at 6pm, gets called back at 11pm for a gearbox, and goes home at 4am. Day shift starts at 6am.

When a breakdown changes the rules

There's an exception, and engineers half-know it, which is dangerous.

Regulation 21 switches off the daily rest, weekly rest and break rules, and the night limits, in some cases. Two of them matter for maintenance. One is where work involves continuity of production, such as "industries in which work cannot be interrupted on technical grounds". The other is where the work is affected by "an accident or the imminent risk of an accident", or by unusual and unforeseeable events beyond your control (regulation 21).

Don't read that as "breakdowns don't count". A machine that fails because the PPM slipped is hard to call unforeseeable. And where the exception does apply, the rest isn't lost. You must "wherever possible" give an equivalent period of compensatory rest (regulation 24). So the fitter who worked through the night comes in late, or has the next day off.

If you're unsure whether an exception fits your site, take advice. Don't build your rota on it.

Night workers get stricter limits

A night worker is someone who regularly works at least three hours* in the night period. That's 11pm to 6am* unless you agree a different period in writing (GOV.UK, night working hours).

Their normal hours mustn't average more than eight hours* in each 24, normally over 17 weeks* (regulation 6). GOV.UK says regular overtime counts towards the average, but occasional overtime doesn't. And workers "cannot opt out of the limit".

There's a harder rule too. If night work involves "special hazards or heavy physical or mental strain", the worker can't work more than eight hours* in any 24-hour period in which they do night work. Not an average. A cap. Work is treated that way if a collective or workforce agreement says so, or your risk assessment recognises it as a significant risk (regulation 6).

Think about that for your night engineer. Lone working, live fault-finding, isolations on big kit. If your own risk assessment flags that as high risk, a 12-hour night shift may be a problem. Read your assessment with this rule in mind.

You must also offer a free health assessment before someone starts nights, and regularly after. Keep records of night workers' hours for at least two years* (GOV.UK, night working hours).

Agency engineers and second jobs

For an agency engineer who isn't otherwise a "worker", the rules apply as if whoever pays them is the employer (regulation 36). That's often the agency. But you're the one who sets the shifts. Ask what else they've worked this week.

The same goes for your own fitters with a side job. GOV.UK says combined working hours "should not be more than 48 hours a week on average" (GOV.UK, calculating your working hours). The fitter doing weekend callouts for someone else is part of your sum.

The real problem is the gap

None of these rules is hard to follow on a fully staffed team. They get broken when there's a gap and the same two people fill it.

The cost goes beyond the legal risk. You get the breakdown on nights that takes longer because the engineer's been awake for 18 hours. You get the fitter who hands in their notice in March. Our piece on overtime as cover looks at where it stops working. When the hours report shows the same names every month, you need another engineer to call on, through shift cover or a bench of engineers you trust.

What to do on Monday

  1. Run a 17-week average for every engineer, including call-ins. Flag anyone over 48 without an opt-out on file.
  2. Check who counts as a night worker, and whether they've been offered a health assessment.
  3. Read your risk assessment for night maintenance and decide if it involves special hazards. If it does, look at your shift length.
  4. Write down how compensatory rest works after a call-out, so the shift manager isn't making it up at 4am.

* The 48-hour average, 17-week reference period, opt-out notice periods, 11-hour daily rest, weekly rest, 20-minute break after six hours, night period, eight-hour night limit and two-year record rule correct as of 28 November 2026. Check the Working Time Regulations on legislation.gov.uk and GOV.UK's working hours guide for the latest.

Cover the hours without breaking the rules

Running a site?

SiteSOS sends vetted maintenance engineers to your site for breakdowns and shift cover. You see the hourly rates first, and you approve the timesheet from your phone when the job's done.

Get engineers on call

Are you an engineer?

Breakdowns and shift cover near you, paid by the job. Offers show where, what, how far and the least you'll earn, and turning one down never counts against you.

Join as an engineer

Read next

More on engineers and cover