RIDDOR for engineering managers: dangerous occurrences explained

Nobody was hurt, so nobody reports it. Some near misses are reportable by law, and your maintenance team is usually first to see them. Which ones, and what to do.

SiteSOS team · · 5 min read

It's 4am. A reach truck is lowering a pallet from the top beam when the mast chain lets go. The forks drop. The pallet hits the floor and splits. The driver's shaken but fine, and nobody was in the aisle.

Your fitter has a spare chain in the stores. By 7am the truck is back on shift and the broken chain is in the scrap bin. The night report says "mast chain failed, replaced, truck OK".

Nobody's done anything wrong on the spanners. But that was a dangerous occurrence under RIDDOR, and nobody has reported it.

Near misses the law cares about

Most managers know RIDDOR for injuries. Deaths, specified injuries, over-seven-day absences. Dangerous occurrences are the other half, and they're easy to miss because nobody needs to be hurt.

HSE describes them as "certain incidents with a high potential to cause death or serious injury". The list sits in Schedule 2 of RIDDOR (HSE, dangerous occurrences). HSE's brief guide says there are 27 categories* that apply to most workplaces (INDG453).

On a factory or warehouse floor, five of them do most of the damage. Your maintenance team will be first on the scene for all five.

Lifting equipment

Paragraph 1 covers "the collapse, overturning or failure of any load-bearing part of any lifting equipment, other than an accessory for lifting" (Schedule 2).

That's our mast chain. It's also a forklift tipping over, a hoist rope parting, or a scissor lift collapsing. HSE says failure here means parts "which break down mechanically during the normal operation", not accidental or deliberate damage (HSE).

Note what's left out. Slings and chains used as lifting accessories don't count under paragraph 1. Nor do electric buttons or radius indicators. A snapped sling is still a serious event, but it isn't a paragraph 1 report.

The truck also needs a LOLER thorough examination. HSE lists "damage or failure" and the repair of critical parts among the exceptional circumstances that call for one (HSE, thorough examinations). Talk to your examiner before it goes back on shift. Our post on LOLER thorough examinations has more.

Pressure systems

Paragraph 2 is the failure of any closed vessel or its pipework in a pressure system, "where that failure could cause the death of any person" (Schedule 2). That means air receivers, steam systems and autoclaves.

The test is what could have happened, not what did. HSE's examples include scalding from steam and being struck, or nearly struck, by a part thrown out when a vessel under pressure fails (HSE). A receiver drain that blows off and flies across the compressor house counts. See our guide to air receivers and the pressure regulations.

Electrical fires and the 24-hour line

Paragraph 4 covers an explosion or fire caused by a short circuit or overload. It's reportable if it stops the plant for more than 24 hours*, or "causes a significant risk of death" (Schedule 2).

This is where a fast fix won't save you. HSE says the incident is still reportable "even if the system in which the damaged equipment was installed is put back into service, using new equipment, within 24 hours". You judge it on how long the repair to the damaged kit would have taken. That time doesn't include delays such as travel or "sourcing parts" (HSE).

So a drive that burns out and takes the panel with it is likely to be reportable, even if you've swapped in a spare panel by lunchtime.

Paragraph 25 catches other fires and explosions. Any unintentional explosion or fire that stops the plant, or stops normal work in the premises, for more than 24 hours* (Schedule 2). HSE's example is a dust explosion in a pneumatic conveying system that stops the conveying plant for more than a day.

Escapes and overhead lines

Paragraph 27 covers the unintentional release of any substance that could injure someone. HSE lists failures of pipes and plant, failures of process control, and a relief valve or bursting disc venting where the escape isn't safely controlled (HSE). Think ammonia on a refrigeration plant, or hot oil from a split hose on a press.

Paragraph 3 is any plant touching an uninsulated overhead line above 200 volts*, or getting close enough to cause a discharge. That's mostly yard work, such as a MEWP or a tipper under the line at the back of the site.

Who reports, and when

For a dangerous occurrence with no one hurt, the responsible person is whoever was in control of the premises at the time (regulation 3). On your own site, expect that to be you, even if a contractor was holding the spanners.

You must tell the enforcing authority "by the quickest practicable means without delay", then send a report "within 10 days of the incident"* (Schedule 1). HSE says the online form is the easiest way (HSE, when to report). Keep a record of every reportable incident for at least three years* (regulation 12).

Don't overthink the call. HSE says reporting "does not require complex analysis". You only need to make "a reasonable judgement on whether the incident caused a real risk of harm" (HSE).

Where maintenance gets it wrong

Here's our view. Most dangerous occurrences go unreported because the people who see them are fixers. The truck's down, the line's waiting, and a good fitter's instinct is to get it running. By the time a manager hears about it, the evidence is in a skip.

The fix is a short rule every engineer knows, including agency and callout engineers who don't know your site. If something load-bearing fails, a pressure part lets go, or there's a fire, stop. Leave the broken parts where they are, take photos, and phone the duty manager before anything is replaced. Our guide to the first hour of a breakdown has more on keeping the scene.

So it matters who you get in at 4am. An engineer who knows these rules will fix the truck and tell you straight that it needs reporting. One who doesn't will hand you a fixed truck and a legal problem you won't hear about until it happens again.

What to do on Monday

  1. Print the five categories above on one page. Put it in every engineer's induction and on the workshop wall.
  2. Add one line to your breakdown report: "Could this be a RIDDOR dangerous occurrence? Yes, no, or ask."
  3. Check the last six months of breakdown logs for failed lifting parts, pressure failures or electrical fires. Talk to your H&S lead about anything you find.
  4. Brief every contractor and callout engineer to keep broken parts and call you before replacing anything load-bearing.

* Number of categories, the 24-hour stoppage tests, the 200-volt figure, the 10-day reporting deadline and the three-year record period correct as of 11 November 2026. Check HSE's dangerous occurrences page and RIDDOR on legislation.gov.uk for the latest.

Get an engineer who'll fix it and tell you straight

Running a site?

SiteSOS sends vetted maintenance engineers to your site for breakdowns and shift cover. You see the hourly rates first, and you approve the timesheet from your phone when the job's done.

Get engineers on call

Are you an engineer?

Breakdowns and shift cover near you, paid by the job. Offers show where, what, how far and the least you'll earn, and turning one down never counts against you.

Join as an engineer

Read next

More on legal duties on site