It's 3am in a 24-hour warehouse. There's one maintenance engineer on site. The night manager is in the office at the far end, watching pick rates. The pickers are on the other side of the racking.
The sorter throws a jam on the top level. The engineer takes the scissor lift up to the mezzanine, isolates the section, and climbs in under the induct belt to clear it.
Nobody else knows they're up there. Nobody will notice if they don't come down. The radio is on the charger in the workshop.
That's lone working on most night shifts. The engineer is trusted, experienced and good at the job. Nobody has said what they can and can't do on their own, or who checks on them.
Alone is allowed. Unplanned isn't
Working alone isn't against the law. HSE's guidance says "it will often be safe to work alone". But the law expects you to think about the risks and deal with them before people are allowed to do so (INDG73).
HSE's definition of a lone worker is "someone who works by themselves without close or direct supervision". The leaflet names maintenance and repair staff who work apart from others or outside normal hours. That's your night engineer, even with a building full of pickers.
You don't need a separate risk assessment for lone working. You do have to cover it in your general one (INDG73). If you employ five or more workers*, that has to be written down. We've covered the legal side in more detail in lone working: what the law expects for your night engineer. This piece is about running the shift.
Set the limits before the shift
The most useful line in HSE's lone working leaflet is short: "you should set the limits to what can and cannot be done while working alone" (INDG73).
Most sites never do. So the engineer sets the limits themselves at 3am, with a jam on the sorter and the night manager asking when it'll be back.
Write a list. Keep it short and keep it on the workshop wall. We'd start with three groups.
Jobs that need two people, whatever the time:
- live electrical work. HSE's guidance on the electricity regulations says a second person should be there if they could "contribute significantly to ensuring that injury is prevented" (HSR25, regulation 14 guidance). Its examples include working on live, uninsulated conductors at 230V
- confined spaces. HSE says a supervisor may need to be present, "along with someone dedicated to the rescue role" (INDG73). See our piece on confined spaces in maintenance work
- anything lifted that one person can't safely control
Jobs that can be done alone with a check-in before and after:
- work at height on a scissor lift or MEWP
- getting inside a machine, even with it isolated
- anything with stored energy: hydraulics, air, springs, raised tables
Jobs that can be done alone as normal: sensor swaps, resets after a proper look, belt changes at floor level, the routine stuff.
The list stops the engineer having to argue with the night manager at 3am. If the job's on the two-person list, it waits or a second person comes in. That's the decision made in daylight, by you.
Know where they are
Next is the one that saves lives. If the engineer collapses, falls or gets trapped, how long before anyone notices?
HSE's list of ways to keep in touch includes supervisors visiting, pre-agreed check-in times, and "devices designed to raise the alarm in an emergency which can be operated manually or automatically" (INDG73). It also says to test them, along with all emergency procedures, regularly.
On a night shift that can be simple:
- The engineer tells the night manager before they start any job on the check-in list. Where, what, and roughly how long.
- If the job takes longer, they call in. If they don't, the night manager goes to look. Not a text. Goes to look.
- The radio goes with the engineer, not on the charger. If you've bought a lone worker device, make sure it's worn, charged and tested.
The second step is where it breaks. The night manager gets busy, the call doesn't come, nobody chases it. So make it someone's job, with a name, on every shift.
First aid when nobody's around
HSE's leaflet says your risk assessment may show some lone workers should carry first aid kit, and may need training "including how to administer first aid to themselves" (INDG73). It also says emergency procedures should be practised, regularly and realistically.
Ask yourself who would reach your engineer if they were trapped in the sorter at 3am. Who can get into the locked panel, and who knows how to lower the scissor lift from the ground? If the answer is "the engineer", you've got a gap. We look at that in first aid cover on nights and weekends.
New to the site means not alone yet
HSE's advice is that lone workers may need to be accompanied at first when they're new to a job, being trained, doing a job with specific risks, or dealing with new situations (INDG73).
That matters for cover. An agency engineer on their first night doesn't know where your isolators are, which panels feed what, or where the sorter's air dump is. Putting them on nights alone, first shift, is a risk you've chosen. Give them at least one shift alongside someone who knows the site. Our guide to inducting a contract engineer covers the rest.
It works the other way too. If you're short-staffed and have to put someone new on nights, you need the right engineer: someone who's done nights alone before, on kit like yours.
When the job needs two and you've got one
This is the cost nobody plans for. It's 3am, the fault needs live testing or a confined space entry, and there's one engineer on site. Do it right and the job waits until day shift. That can be four hours of a stood sorter, a backlog that runs into the morning wave, and trailers going out late. Do it wrong and someone gets hurt.
Neither is a good answer, and both come from the same place: one engineer, no plan for the second. Work out what a night like that costs you. Then look at whether a second engineer on your busiest nights, or someone you can call in at short notice, is cheaper. Night shift maintenance cover is hard to fill, so line it up before you need it.
What to do on Monday
- Write your two-person list and your check-in list, and put them on the workshop wall.
- Name who checks on the night engineer on every shift, and agree what they do when a check-in is missed.
- Walk through a rescue from your worst spot on nights. Who gets there, with what, and how fast?
- Count last month's night faults that had to wait for a second person, and what they cost.
* The five-employee threshold for recording a risk assessment is correct as of 23 November 2026. Check HSE's lone working leaflet, INDG73 for the latest.