It's 4am. A mounting bracket on the conveyor drive has cracked through, and the motor is sagging on its belt. The quickest fix is to weld a plate across it. The MIG set is in the workshop. The conveyor runs under a mezzanine stacked with flat-pack cartons, and there's twenty years of dust on the steel above.
Your fitter wants it running before the day shift. Ten minutes of welding and it's done.
The welding is the easy part. The fire that starts 40 minutes later, in a carton on the mezzanine, after everyone has gone back to the line, is the part that costs you the building.
Grinding is hot work too
HSE defines hot work as any process that generates flames, sparks or heat. That includes welding, cutting, grinding and sawing (INDG314). Plenty of sites run a permit for welding and then let anyone take a grinder to a seized bolt without one. Sparks from a 9-inch grinder travel a long way. HSE's welding guidance says heat, sparks and drips of metal and slag can travel a considerable distance and start fires in adjacent rooms (HSE, other welding risks).
On most sites, hot work is controlled through the fire risk assessment. Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person must make a suitable and sufficient assessment of the fire risks to people on the premises (article 9). The government's fire safety guide for factories and warehouses lists hot work, such as welding by contractors, as a source of ignition. It tells you to strictly control hot work by running permit to work schemes (GOV.UK, fire safety risk assessment: factories and warehouses).
Can you do it cold?
Start with the question nobody asks at 4am. Does it need heat at all? HSE suggests cold cutting or cold repair techniques, and replacing a part instead of repairing it (INDG314).
For that cracked bracket, a bolted clamp plate or a spare bracket from the stores would do the job with no sparks. It might take longer. But a welded plate on a drive bracket also tends to become the permanent fix, which is a problem in its own right. We've written about how temporary fixes become permanent.
What the permit is for
A permit to work is a written check that the area is safe before the work starts and stays safe after it. The fire safety guide sets out three jobs for a hot work permit. Make the area as safe as possible before any hot work starts. Keep monitoring and taking precautions while the work goes on. Then watch the area and the space around it "for at least an hour" after the work is finished (GOV.UK fire safety guide).
HSE's guidance on permit systems says hot work permits are typically red or red-edged. It also suggests separate forms for hot work and confined space entry, so each gets proper attention (HSG250). Our general piece on running permits to work covers who issues and who signs off.
A permit that works on the shop floor covers:
- the exact job and location, with a time limit
- what's been cleared away, and what's been covered with fire blankets
- what's above, below and behind the work, including the other side of the wall
- fire detection: whether a zone needs isolating, and who puts it back
- the extinguisher at the job, and the person who knows how to use it
- the fire watch, by name, with a finish time
INDG314 adds two points. The permit system should apply to contractors and subcontractors too. And hot work should not go ahead unless it's authorised and properly supervised by an experienced manager or supervisor who knows the work, the risks and the precautions (INDG314).
Clear it, then watch it
HSE's advice is to clear away wood, fabric, cardboard and other flammable material before a welding job starts. Where you can't move the work to a safe area, or can't clear what will burn, keep a fire watch during and after the work. HSE says that watch should last at least 30 minutes* after the hot work ends. If a fire could be slow to develop or hard to spot, it may need to be 60 minutes* (HSE, other welding risks).
So HSE says 30 to 60 minutes, and the government's fire guide for factories says at least an hour. Our view is simple. On a site with cartons, pallets, dust on the steel or anything else that smoulders, watch for the hour. A smouldering carton does nothing for a while, then it all goes at once. The fire guide also tells you to check every area where hot work has been done for anything still smouldering (GOV.UK fire safety guide). Dust and plant fires have their own risks, covered in fire risk from plant, dust and hot work.
The fire watch is a second person
This is the part that breaks on nights. A proper fire watch means someone who isn't welding. They're watching for sparks while the work goes on, then staying for the hour after. On a night shift with one fitter, there is nobody to do that.
So either the welder becomes the fire watch, which means nobody is watching while they weld. Or the job waits for days. Or someone signs the permit anyway. None of those is good. If hot work is likely on a breakdown, plan who keeps the fire watch on every shift, or get a second engineer in to do the job properly. An hour of someone's time costs a lot less than a fire in a warehouse.
Drums and tanks
The worst hot work accidents involve containers. HSE warns that a tank or drum can explode violently if a torch or powered cutter is used on it while it holds flammable material. Drums that seem empty usually still have residues in the bottom and in the seams. Just a teaspoon of petrol in a drum can be enough to cause an explosion once it's heated (INDG314).
The same leaflet describes a case where a risk assessment said to use a pneumatic chisel on a drum that had held engine oil. The operator used a flame cutter instead because it was quicker. The oil residues vaporised and the drum exploded, and the operator was seriously injured. If it's a tank, a drum or a pipe that has carried anything that burns, it needs cleaning or gas-freeing first, and often a specialist. Where flammable vapour is part of the process, read our piece on DSEAR and explosive atmospheres too.
What to do on Monday
- Check your hot work permit covers grinding and cutting, not only welding.
- Change the fire watch on the permit to an hour, with a named person and a finish time.
- Work out who keeps the fire watch on nights and weekends when only one fitter is on.
- Put a cold-repair kit in the stores: clamp plates, spare brackets, cold-cure repair compound.
* The 30-minute and 60-minute fire watch figures, and the one-hour monitoring period in the fire safety guide, correct as of 22 November 2026. Check HSE's welding fire and explosion guidance and the GOV.UK fire safety guide for factories and warehouses for the latest.